Turbo-Lube XLT Well Recap

PROBLEM ENCOUNTERED:

THE OPERATOR WAS EXPERIENCING SERIOUS DRAG COMING OFF BOTTOM BEFORE MAKING THE CURVE. THE PENETRATION RATE ON SLIDING HAD DECREASED TO 2-4 FT./HR.

PRIOR APPLICATON:

THE OPERATOR WAS RUNNING CEDAR FIBER AND NUT PLUG FOR LOSSES WHEN THE PENETRATION RATE SUDDENLY DECREASED.

PRODUCT APPLICATON:

TURBO-CHEM ADDED 110 GALLONS OF TURBO-LUBE XLT TO 70 BBLS OF AN 9.5 PPG OBM (3.6 %). TCI RECOMMENDED PUMPING THIS MIXTURE IN 10 BBL SWEEPS.

RESULTS:

AFTER PUMPING THE FIRST 10 BBL SWEEP CONTAINING 3.6% TURBO-LUBE XLT, THE OPERATOR SAW AN INCREASE IN PENETRATION RATE ON THEIR SLIDE TO 23 FT./HR. AND NEVER FALLING BELOW 18 FT./HR. TURBO-LUBE XLT WAS PIVOTAL IN INCREASING THE ROP AND REDUCING TORQUE AND DRAG FOR THE OPERATOR. AT ONE TIME THE OVER-PULL WAS 30,OOO AND TURBO-LUBE XLT REDUCED THAT TO 1,000!