First Response Well Recap

PROBLEM ENCOUNTERED:

THE OPERATOR WAS KICKING OFF AT 7,531’ AND DRILING A 6.125” HOLE LOSING RETURNS AT 55 BBLS. /HR.

PRIOR APPLICATON:

SPECIALTY “WOODEN/PLASTIC BLEND” LCM WAS PUMPED IN VARIOUS CONCENTRATIONS OVER THE COURSE OF 2 DAYS WITH NO SUCCESS. AT 8,114’ TURBO-CHEM WAS CALLED OUT TO PUMP FIRST RESPONSE IN AN EFFORT TO SLOW THE LOSSES AND SAVE THE WELL.

PRODUCT APPLICATON:

TURBO-CHEM RECCOMENDED AND MIXED AN 80 BBL PILL CONTAINING 50 PPB OF FIRST RESPONSE. 3, 20 BBL PILLS WERE PUMPED THROUGH THE ROTARY STERABLE DIRECTIONAL TOOLS ACROSS THE LOSS ZONE. LOSSES BEGAN TO SLOW IMMEDIATELY TO 30 BBLS./HR. AND 15 BBLS./HR AFTER THE SECOND SWEEP. THE THIRD SWEEP REDUCED LOSSES TO LESS THAN 3 BBLS/HR. ALLOWING THE OPERATOR TO POOH AND CHANGE THE BIT.

RESULTS:

THE OPERATOR WAS ABLLE TO TIH TO BOTTOM WITH NO LOSSES, THAN BEGIN DRILLING AHEAD PUMPING 10 BBL FIRST RESPONSE SWEEPS AT 25 PPB EVERY 90’-200’ UNTIL TD. THE OPERATOR WAS ECSTATIC WITH THE FIRST RESPONSE PRODUCT ALONG WITH THE EASE OF MIXING AND ABILITY TO PUMP THE PRODUCT THROUGHT THE SLIM HOLE TOOLS WITH NO ISSUES.

Print This Page

Endless hours of Engineering and Technology have gone into perfecting each of our products and services. For immediate information on any of our products call 1-800-259-7838.

Contact Us