EZ SqueezeTM

PROBLEM ENCOUNTERED:

OPERATOR HAD COMPLETE LOSSES (@ 90 BBL/HR) AT 6,220’ WHILE DRILLING AHEAD. THE OPERATOR WAS RUNNING A 12.5 PPG WBM.

PRIOR APPLICATON:

THE OPERATOR PUMPED THE FOLLOWING PILLS: (FIRST) 80 BBL PILL CONTAINING 30 PPB STEEL SEAL, 10 PPB BARACARB 50, 10 PPB BARACARB 150 AND 10 PPB BAROFIBRE. THIS FAILED TO STOP MUD LOSSES. (SECOND) 50 BBL SWEEP CONTAINING 8 PPB BAROFIBRE, 8 PPB BARACARB 50, 8 PPB BARACARB 150 AND 25 PPB STEEL SEAL 400. AFTER DRILLING 20’, COMPLETE RETURNS WERE LOST AGAIN. (THIRD) 80 BBL PILL CONTAINING 30 PPB STEEL SEAL, 10 PPB BARACARB 50, 10 PPB BARACARB 150 AND 10 PPB BAROFIBRE. OPERATOR WAS STILL LOSING COMPLETE RETURNS.

PRODUCT APPLICATON:

TURBO-CHEM RECCOMENDED AND PUMPED A 105 BBL EZ SQUEEZE @ 12.5 PPG AND DISPLACED 84 BBLS, SHUT THE WELL IN AND ALLOWED FOR A 4 HOUR WAIT.

RESULTS:

AFTER HESITATING ON THE EZ SQUEEZE PILL A FEW TIMES, THE OPERATOR WAS DELIGHTED ABOUT THE RESULTING PRESSURES (975 PSI – 1055 PSI). ONCE THE OPERATOR OPENED THE WELL AGAIN, THEY WERE ABLE TO TD WITH NO FURTHER LOSSES. E Z SQUEEZE WAS SUCCESSFUL.

Print This Page

Endless hours of Engineering and Technology have gone into perfecting each of our products and services. For immediate information on any of our products call 1-800-259-7838.

Contact Us