CASE STUDIES

Turbo-Lube XLT Well Recap pt2

“At Turbo-Chem, we are committed to quality and committed to you!”. TURBOCHEM CASE STUDIES Turbo-Lube XLT Well Recap pt2 THE OPERATOR WAS HAVING PROBLEMS WITH WATER FLOW WHILE RUNNING OIL BASE MUD @ 11,800’. IT WAS DECIDED TO SWITCH TO A WEIGHTED POLYMER MUD. THE...

read more

Turbo-Lube XLT Well Recap

“At Turbo-Chem, we are committed to quality and committed to you!” TURBOCHEM CASE STUDIESTurbo-Lube XLT Well Recap THE OPERATOR WAS EXPERIENCING SERIOUS DRAG COMING OFF BOTTOM BEFORE MAKING THE CURVE. THE PENETRATION RATE ON SLIDING HAD DECREASED TO 2-4 FT./HR. THE...

read more

SwelLCM / EZ Squeeze Well Recap

“At Turbo-Chem, we are committed to quality and committed to you!” TURBOCHEM CASE STUDIESSwelLCM / EZ Squeeze Well Recap THE OPERATOR WAS FIGHTING WELL CONTROL ISSUES FOR 12 DAYS AND LOST A TOTAL OF 6,100 BBLS OF SYNTHETIC BASE MUD. THE OPERATOR NEEDED TO GET A GOOD...

read more

EZ SqueezeTM pt2

“At Turbo-Chem, we are committed to quality and committed to you!” TURBOCHEM CASE STUDIESEZ SqueezeTM pt2 WHILE DRILLING AT +/- 8,969’, RETURNS WERE LOST (10.3 PPG CLS WBM). CEMENT SQUEEZE WAS ATTEMPTED BUT WELL WAS ULTIMATELY SIDETRACKED. WHILE DRILLING SIDETRACK #1,...

read more

EZ SqueezeTM

“At Turbo-Chem, we are committed to quality and committed to you!” TURBOCHEM CASE STUDIESEZ SqueezeTM OPERATOR HAD COMPLETE LOSSES (@ 90 BBL/HR) AT 6,220’ WHILE DRILLING AHEAD. THE OPERATOR WAS RUNNING A 12.5 PPG WBM. THE OPERATOR PUMPED THE FOLLOWING PILLS: (FIRST)...

read more

B.F.S. Well Recap pt2

“At Turbo-Chem, we are committed to quality and committed to you!” TURBOCHEM CASE STUDIESB.F.S. Well Recap pt2 THE OPERATOR WAS EXPERIENCING LOSSES IN EXCESS OF 100 BBLS. / HR. IN 11.5 PPG OBM AT 16,110’. THE OPERATOR PUMPED SEVERAL COMPETITORS PRODUCTS CONTAINING...

read more

B.F.S. Well Recap

“At Turbo-Chem, we are committed to quality and committed to you!” TURBOCHEM CASE STUDIESB.F.S. Well Recap THE OPERATOR WERE ENCOUNTERING LOSSES AT 35-40 BBLS. /HR. WHEN DRILLING INTO THE AUSTIN CHALK. THE OPERATOR PUMPED SEVERAL COMPETITORS PRODUCTS CONTAINING...

read more

Bore-Seal 100 Well Recap pt2

“At Turbo-Chem, we are committed to quality and committed to you!” TURBOCHEM CASE STUDIESBore-Seal 100 Well Recap pt2 WHILE SLIDING AHEAD AT 7,680’ THE OPERATOR ENCOUNTERED TIGHT SPOTS AND SEEPAGE LOSSES. THE OPERATOR ATTEMPTED TO HEAL THE HOLE WITH CONVENTIONAL...

read more

Bore-Seal 100 Well Recap

“At Turbo-Chem, we are committed to quality and committed to you!” TURBOCHEM CASE STUDIESBore-Seal 100 Well Recap WHILE SLIDING AHEAD AT 7,680’ THE DECISION WAS MADE TO POOH DUE TO UNSATISFACTORY BHA PERFORMANCE. THE OPERATOR SAW A SUDDEN 20-30 BBL LOSS OF MUD @...

read more

First Response Well Recap

“At Turbo-Chem, we are committed to quality and committed to you!” TURBOCHEM CASE STUDIESFirst Response Well Recap THE OPERATOR WAS KICKING OFF AT 7,531’ AND DRILING A 6.125” HOLE LOSING RETURNS AT 55 BBLS. /HR. SPECIALTY “WOODEN/PLASTIC BLEND” LCM WAS PUMPED IN...

read more

First Response / SYN-Seal Well Recap

“At Turbo-Chem, we are committed to quality and committed to you!” TURBOCHEM CASE STUDIESFirst Response / SYN-Seal Well Recap THE OPERATOR LOST RETURNS (25-30 BBLS) ABOVE THE WILCOX FORMATION. THEY ARE WANTING TO TOH TO START DRILLING THEIR CURVE. CONVENTIONAL CALCIUM...

read more

SYN-Seal Well Recap

“At Turbo-Chem, we are committed to quality and committed to you!” TURBOCHEM CASE STUDIESSYN-Seal Well RecapTHE OPERATOR WAS ECOUNTERING TIGHT SPOTS AND SEEPAGE LOSSES AS THEY DRILLED THEIR LATERAL. CONVENTIONAL GRAPHITE AND GENERIC FIBER LCM SWEEPS WERE NOT SLOWING...

read more

Premium Seal / Turbo-Phalt Well Recap

“At Turbo-Chem, we are committed to quality and committed to you!” TURBOCHEM CASE STUDIESPremium Seal / Turbo-Phalt Well RecapTHE OPERATOR WAS CONCERNED ABOUT MINOR LOSSES,TIGHT SPOTS AND SEEPAGE.THE OPERATOR ATTEMPTED TO HEAL THE HOLE WITH CONVENTIONAL CALCIUM...

read more

Premium Seal Well Recap

“At Turbo-Chem, we are committed to quality and committed to you!” TURBOCHEM CASE STUDIESPremium Seal Well RecapTHE OPERATOR LOST RETURNS WHILE DRILLING TO BOTTOM (9,000’). THE OPERATOR ATTEMPTED TO HEAL THE HOLE WITH CONVENTIONAL, GENERIC MUD COMPANY PILLS ( 60 PPB...

read more

Endless hours of Engineering and Technology have gone into perfecting each of our products and services. For immediate information on any of our products call 1-800-259-7838.

Contact Us