PROBLEM ENCOUNTERED:

WHILE SLIDING AHEAD AT 7,680’ THE OPERATOR ENCOUNTERED TIGHT SPOTS AND SEEPAGE LOSSES.

PRIOR APPLICATON:

THE OPERATOR ATTEMPTED TO HEAL THE HOLE WITH CONVENTIONAL GRAPHITE AND GENERIC FIBER LCM SWEEPS. THE SEEPAGE CONTINUED, LEADING TO EXCESS TREATMENT.

PRODUCT APPLICATON:

TURBO-CHEM RECCOMENDED ADDING 7-8 PPPB BORE-SEAL 100 TO THE ACTIVE SYSTEM TO REMEDIATE THE SEEPAGE PROBLEM. BORE-SEAL 100 SWEEPS WERE RAN WHENEVER MINOR LOST CIRCULATION EVENTS WERE SEEN WHILE DRILLING THE LATERAL. THE HOLE WAS HEALED IMMEDIATELY AFTER THE SWEEP LEFT THE BIT.

RESULTS:

UPON ADDING THE BORE-SEAL 100 TO THE SYSTEM, THE OPERATOR WAS ABLE TO DRILL TO 12,330’ WHILE ELIMINATING SEEPAGE. CONCRURRENT BORE-SEAL 100 SWEEPS AIDED THE OPERATOR IN GETTING THROUGH THE TIGHT LATERAL AS WELL AS 2 FOLLOW UP TRIPS THROUGH THE DEPLETED ZONE WITH NO FURTHER LOST CIRCULATION/SEEPAGE ISSUES.

Print This Page

Endless hours of Engineering and Technology have gone into perfecting each of our products and services. For immediate information on any of our products call 1-800-259-7838.

Contact Us