B.F.S. Well Recap pt2

PROBLEM ENCOUNTERED:

THE OPERATOR WAS EXPERIENCING LOSSES IN EXCESS OF 100 BBLS. / HR. IN 11.5 PPG OBM AT 16,110’.

PRIOR APPLICATON:

THE OPERATOR PUMPED SEVERAL COMPETITORS PRODUCTS CONTAINING CRUMB RUBBER AND INERT SOLIDS LCM WITH NO RESULTS.

PRODUCT APPLICATON:

TURBO-CHEM MIXED AND PUMPED A 40 BBL PILL CONTINING 40 PPB BFS AT THE BOTTOM OF THE LOSS ZONE (16,110’). THE PILL WAS SPOTTED ON BOTTOM AND THEN PULLED ABOVE THE LOSS ZONE AND BEGAN CIRCULATING ABOVE THE PILL ENACTING A “SOFT SQUEEZE” WITH THE ECD. THE WELL WAS SHUT IN.

RESULTS:

TURBO-CHEM’S NEW INNOVATIVE BFS PRODUCT WAS ABLE TO REDUCE 100 BBLS. /HR. LOSSES TO ZERO. THE OPERATOR, DRILLING ENGINEER AND SUPERINTENDENT WERE VERY IMPRESSED WITH TCI’S NEW BFS WELLBORE STABILIZING PRODUCT.